Advance of the erection of the viaduct on the Serpis river

The placement of sections of the steel structure of the composite (steel & concrete) viaduct over the river Serpis at the access to the port of Gandía is progressing at a good pace.

IDEAM has made the modified detailed design and is performing technical assistance during the execution. Copcisa is the constructor, Horta-Cosalada the steel workshop and the property is the Ministry of Public Works.

The bridge has 4 continuous spans of 36 + 59 + 59 + 36 m span with variable depth and also variable width of up to 17.60 m.

http://www.ideam.es/ideam_projects/road-composite-bridges-en/puente-sobre-el-rio-serpis-en-gandia/?lang=en