New Champlain Bridge Montreal, Quebec. Canadá
Montreal, Quebec. Canadá
Main span cable stayed, other spans composite steel beams
Infrastructure Canada
SSLC (SNC Lavalin, DRagados Canada, Flatiron Constructors Canada Joint Venture). Designers EJV (T.Y.Lin Internatinal, IBY, SLI)
Coordination and follow-up of the execution of the steel pier caps and quality control assurance in the steel workshops
2018

3,334.80m
Main span 240m. Other spans from 80.40 to 84.40m
50.30 m with decks of 22.11 and 17.30m
Pylon of 158m, piers of a maximum height of 38.50m
TOP