Formwork Traveller for the Mersey viaduct Runcorn (Borough of Halton). UK
Runcorn (Borough of Halton). UK
Formwork traveller for construction of the cable-stayed cross-section, built in cantiléver Formwork wing-traveller for construction of the flanges of the cross-section of approach spans
Halton Brorough Council
FCC-Samsung-Kier
CAT III Checking of formwork traveller (including lifting structure) of the cable-stayed viaduct, and wing traveller of the approach spans

2,248 m
49.50+64.17+70+67.67+6x64.17+17+70 m
181+249+318+205 m
68+6x70+56 m
32.20 to 42.90 m
720 m in North access viaduct
TOP