There are hardly any small finishing works left, and the new outstanding arch bridge of “La Concordia” in Valdebebas, Madrid looks impressive.
“La Concordia” arch bridge connects Terminal T-4 of Madrid Barajas airport with Valdebebas crossing over the M-12, with a main span of 162 m, a total length of 214 m and a width of 24.5 m, which makes it on the longest span in the Region of Madrid.
https://lnkd.in/dC7midi
IDEAM, S.A. is the author of the structural conception, the detailed design and the Construction Management for Junta de Compensación Parque de Valdebebas and Ferrovial is the constructor.
We cannot be more satisfied and proud of the great work done by all those involved in this great work, which will be the gateway to Madrid.