Sometimes reality improves the results of renders, drawings and even models. This is the case of the new La Concordia bridge in Valdebebas.
The result will be even more noticeable when the temporary braces, reddish in color in the image above, used during the installation maneuver, are removed and the work is completed in a few months.
The arch bridge will connect the Terminal T-4 of the Madrid Barajas airport with Valdebebas crossing over the M-12 Higway, with a main span of 162 m, a total length of 207 m and a width of 24.5 m.
IDEAM, S.A. is the author of the structural conception, the detailed design and is carrying out the Construction Management for Junta de Compensación Parque de Valdebebas and Ferrovial is the constructor.