The execution of the steel structure of the Viaduct over the river Serpis begins

The execution of the Steel structure of the Viaduct over the river Serpis in the new access to the port of Gandia that is being built by Copcisa for the Spanish Ministry of Public Works is already underway. The steel workshop is Horta-Coslada.

IDEAM has made the detailed design and is doing the technical assistance during the execution of the composite viaduct that has 4 spans of 36 + 59 + 59 + 36m span and variable width with up to 17.60m.

(Aerial image courtesy of Copcisa)

https://www.ideam.es/ideam_projects/road-composite-bridges-en/puente-sobre-el-rio-serpis-en-gandia/?lang=en